Pump Hoist for large
commercial & deep residential
Some of our recent projects...
This
is a water well rehabilitation job in Manassas Virginia. The
original well had collapsed and needed to be cleaned out and
deepened. We utilized our limited access “Berretta” drill for
this effort because of the inability to move a large drilling
rig on the site.
Example of butt fusing HDPE large supply and return lines. This
installation was for the National Guard in Winchester, VA
Drilling a Thermal Conductivity bore hole for a Middle School in
Rockbridge County, VA. We utilized a sediment bag to contain the
“rock cuttings”.
One of
many thermal conductivity tests we have run to test the
formations ability to absorb heat energy. This job was in
Loudoun County, VA.
Installation of Rehau’s Raugeo four probe geothermal loop in
Winchester, VA. This pipe has no fusion joints down the borehole
and utilizing 4 pipes gives 15% to 20% more efficiency.
Preparing the concrete header vault for 50 geothermal loops. The
tarp is only used to work during the rain. This installation was
for the National Guard in Winchester, VA
In a
very small site we used our limited access drill to bore 5—150’
holes for a geothermal heat pump. This drill can be utilized in
mud and air rotary as well as hollow stem auger. It has a tested
maximum depth of 300’. Will it go deeper….don’t know yet.
We
just had enough room to use our large drill to install 2—300’
wells for this “Green Home” built in Arlington, VA
Preparing a loop for one of several VDOT geothermal jobs.
This
was the first commercial job in the USA to header a geothermal
job using Rehau’s probalance manifold. The manifolds give the
ability to perfectly match the flow from loop to loop as well as
isolate as failed loop in the rare case it happens. This
installation was for the National Guard in Winchester, VA